首页 | 主题 | 图库 | 问答 | 文摘 | 原创 | 百科

历史 | 地理 | 人物 | 艺术 | 体育 | 科学 | 音乐 | 电影 | 信息技术 | 世界遗产

 开放、中立,源自维基百科

Personal tools

CDGVAL

From Wikipedia, the free encyclopedia

Jump to: navigation, search
CDGVAL
Year opened 2007
Last extension 2007
Rolling stock VAL 208
Stations served 5 (1st line)
2 (2nd line)
Length 3.5 km
Length 2.2 mi
Average interstation 875 m
Journeys made (per annum)
Paris public transport
Métro lines
Image:Paris m 1 jms.svg line 1 Image:Paris m 7bis jms.svg line 7bis
Image:Paris m 2 jms.svg line 2 Image:Paris m 8 jms.svg line 8
Image:Paris m 3 jms.svg line 3 Image:Paris m 9 jms.svg line 9
Image:Paris m 3bis jms.svg line 3bis Image:Paris m 10 jms.svg line 10
Image:Paris m 4 jms.svg line 4 Image:Paris m 11 jms.svg line 11
Image:Paris m 5 jms.svg line 5 Image:Paris m 12 jms.svg line 12
Image:Paris m 6 jms.svg line 6 Image:Paris m 13 jms.svg line 13
Image:Paris m 7 jms.svg line 7 Image:Paris m 14 jms.svg line 14
RER lines
Image:Paris rer A jms.svg line A Image:Paris rer D jms.svg line D
Image:Paris rer B jms.svg line B Image:Paris rer E jms.svg line E
Image:Paris rer C jms.svg line C
Suburban rail (Transilien)
Image:Paris logo banlieu jms.svg Saint-Lazare Image:Paris logo banlieu jms.svg Nord
Image:Paris logo banlieu jms.svg La Défense Image:Paris logo banlieu jms.svg Est
Image:Paris logo banlieu jms.svg Montparnasse Image:Paris logo banlieu jms.svg Lyon
Airport shuttles
Image:Paris logo orlyval jms.svg CDGVAL Image:Paris logo orlyval jms.svg Orlyval
Bus
Image:Paris logo bus jms.svg Bus (RATP) Image:Paris logo noctilien jms.svg Noctilien
  Bus (Optile)  
Tramway
Image:Paris tram 1 jms.svg Tramway T1 Image:Paris tram 2 jms.svg Tramway T2
Image:Paris tram 3 jms.svg Tramway T3 Image:Paris tram 4 jms.svg Tramway T4


CDGVAL is a free automatic shuttle service at Charles de Gaulle International Airport with two lines, a first line which opened on April 4, 2007 and a second on June 27, 2007. Based on the VAL system and using VAL 208 coaches, the first five-station line links the three airport terminals, RER and TGV stations and remote parking within 8 minutes. At rush hours, train frequency is 4 minutes.

The service will be jointly operated on a 24-hour basis by Siemens and Keolis for a period of six years.


Contents

History

The CDGVAL project replaced the SK6000 project, which was abandoned after unsuccessful test runs in 1999. CDGVAL was launched in 2000, with construction work beginning in 2003. Total cost is estimated at €145 million.


LISA

A second CDGVAL line, called LISA (Liaison Interne Satellite Aérogare), is linking Terminal 2E and the Terminal S3 and opened on June 27, 2007. It is located within the security controlled area of the airport and therefore only accessible to flight passengers. It is 0.6 km long (2 stations). This link will later be extended to the future Terminal S4.

Map

Image:CDGVAL.svg
Geographically accurate path of the first line of Paris CDGVAL.

See also

Wikimedia Commons has media related to:

External links

es:CDGVal fr:CDGVAL id:CDGVAL nl:CDGVAL

AD Links